International Maritime Organization (IMO) is imposing increasingly stringent emissions regulations to meet its environmental commitments.
IMO Sulphur reductions came into effect on January 1st., 2020, when the global Sulphur cap will be lowered from 3.5 to 0.5%.
Implications of this move will be felt widely. Ship owners have three key options to meet the new Sulphur requirements:
ALONGSIDE 7 offer customized, turnkey solutions for Ballast Water Treatment System & Scrubber System Installation Projects
1.- EVALUATION & SELECTION OF SYSTEM / TECHNO & ECONOMIC ANALYSES
General guidance for understanding BWTS & Scrubber technology
Evaluation of System quotations
CAPEX, OPEX Calculations
2.- SURVEY & 3D LASER SCANNING
Visual Survey onboard and 3D Laser Scanning of suggested installation spaces
Checking of installation scenarios and available resources
Detailed Reporting
3.- BASIC ENGINEERING – FEASIBILITY STUDY
Main System components + main piping + service spaces are modeled inside the point cloud
Virtual installation scenarios and Feasibility study.
4.- FINAL INSTALLATION DRAWINGS & PRE-FABRICATION
Final installation scenario
Drawings for Classification Approval
Installation drawings (for pre-fabrication)
Our advantages
Proven BWTS retrofit track record
Hands-on experience
Dedicated project management team
Skilled and experienced workforce
Procurement and prefabrication services
Location and disposal for Docking and berthing facilities
BWTS retrofits in parallel with scheduled maintenance
All mayor class societies offices located
Warehouse for safe keeping of BWTS equipment before installation